Shoring

 

Robust temporary support solution designed to stabilize and reinforce structures during construction, renovation, and demolition projects.

Our modular shoring system provides comprehensive structural support for walls, floors, and existing building elements that require temporary reinforcement. This pre-engineered system is designed to meet and exceed OSHA requirements for worker safety and structural stability while offering the flexibility to adapt to varying load requirements and site configurations. The system combines adjustable shore posts, cross-bracing components, frame assemblies, and tie elements that work together to create a secure support structure. Designed for quick installation and easy reconfiguration, the system offers a reliable way to support existing structures, manage load redistribution, and maintain site safety during active construction. Its modular and reusable design provides a cost-effective solution that can be customized to meet the changing needs of various construction and renovation projects.


SPECIFICATIONS

Dimensions & Configuration:

Highly configurable with adjustable shore posts available in multiple height ranges and load capacities. System components include #2 shore posts, frame crossbraces in various spreads, frame assemblies, side brackets, and tie components that combine to create custom shoring solutions for any structural requirement.

Key Features:

  1. Adjustable shore posts with multiple height and capacity options

  2. Modular cross-bracing system for flexible configurations

  3. High load-bearing capacity for structural support

  4. Durable metal construction built for repeated use

  5. Easy assembly and disassembly requiring minimal tools

  6. OSHA compliant structural support standards

  7. Adaptable to various structural conditions and geometries

Applications:

  1. Temporary wall and floor support during renovation

  2. Structural reinforcement for demolition projects

  3. Load redistribution and stabilization

  4. Underpinning and shoring of existing structures

  5. Construction phasing and temporary bracing

  6. Compliance with structural safety regulations