Temporary Fencing

 

Highly configurable perimeter protection and containment solution designed for active construction sites.

Our modular temporary fencing system provides a comprehensive barrier solution for hoistway protection, debris containment, equipment staging areas, and general site access control. This versatile, pre-engineered system is designed to meet and exceed OSHA 213/91REGS requirements while offering the flexibility to adapt to any site layout and height requirement.

The system combines reusable fence panels, guard posts, guard rails, mounting brackets, and tie components that work together to create a secure and professional-looking perimeter. Designed for quick installation and easy reconfiguration, the system offers a secure way to protect work areas, manage traffic flow, separate active construction zones, and contain debris. Its highly modular and reusable design provides a cost-effective solution that can be customized to meet the changing needs of various job sites, offering configurations from standard wall applications to complete enclosures.


SPECIFICATIONS

Dimensions & Configuration:

Infinitely configurable with multiple frame sizes, panel heights, and bracket options available to accommodate custom heights and widths. System components include fence panels, guard posts, guard rails, side brackets in various sizes, and tie components that combine to create any configuration from standard wall applications to complete enclosures.

Key Features:

  1. Modular panel and post system for infinite configurability

  2. Multiple frame sizes and bracket options for custom heights and widths

  3. Durable, weather-resistant components built for repeated use

  4. Easy assembly and disassembly requiring minimal tools

  5. Transparent and opaque panel options for visibility control

  6. OSHA compliant protection standards

Applications:

  1. Elevator hoistway protection

  2. Debris containment and management

  3. Perimeter security and traffic control

  4. Equipment and material staging areas

  5. Partial or full-height site enclosures

  6. Temporary work zone separation